Data centre noise — passing the limit, the community and the inspection
A data centre is quiet inside and loud outside. Tens of megawatts of standby generators that must be tested under load, chillers, cooling towers and dry coolers running 24 hours a day, transformers and inverters humming at low frequency — all in a building that is usually sited near people because it must be near the grid and the fibre. In September 2026 the Bangkok Metropolitan Administration began inspecting data centres across the capital, required advance notification of generator test schedules after a complaint about night-time testing, and cited a normal average not above 70 decibels and not above 115 decibels during testing; at the same time the government paused 166 data-centre projects to write national criteria, naming noise and heat impacts on surrounding areas as a direct concern. Noise is no longer the last item on a data-centre design checklist. It is a condition of getting the permit and of staying open.
When to call us
- A project waiting for the new criteria, which needs its acoustic documentation ready the moment approvals resume
- Site selection and layout — before the generator yard and the chiller yard are locked in by the electrical and piping design
- An environmental impact assessment or permit submission that needs predicted levels at community receptors
- An operating data centre that has received complaints about generator testing or a night-time hum
- Acceptance of the cooling plant and generators from the EPC contractor against the acoustic specification in the contract
- A permit condition requiring noise measurement or continuous monitoring, with reporting to the authority or the community
How we help
- A SoundPLAN model to ISO 9613-2 of the whole site, from the sound power of the generators, chillers, cooling towers and fans, in normal and test conditions — showing the level at the boundary and at the nearest houses as a contour map.
- Options compared on paper — yard position, exhaust orientation, screens, silencers, night-time speed limits — so that decisions are taken while a change is a line on a drawing rather than a seven-figure variation.
- Baseline measurement at the community receptors before construction, establishing the background against which the 10 dBA nuisance criterion will be judged for the life of the project.
- A generator test regime — time, duration, sequence and load — that complies, with the neighbour-notification letter the BMA now requires.
- Boundary measurement during a generator test under real load and with the cooling plant at full duty on the hottest day: the two conditions that decide compliance.
- Source ranking with the 128-microphone acoustic camera where several generator sets and chillers share one yard, so that remediation money goes to the machine that actually governs the level.
- Investigation of low-frequency hum from transformers and inverters, which can comply in dBA and still disturb the community, using spectral and vibration measurement.
- Occupational noise measurement in data halls and plant rooms — a hard-ventilated hall commonly sits at 80–85 dBA, which brings staff into the range where a hearing conservation programme is required.
- Continuous Class 1 boundary monitoring stations with a dashboard, alerts before a limit is reached, and monthly reports for the authority and the community, on a monthly fee without buying the instruments.
What you get
- A prediction report with contour maps for normal and test conditions, for the permit submission and EIA
- An acoustic specification for the EPC and equipment vendors — maximum sound power per unit and target levels at the receivers, written so that it can be verified
- Pre-construction baseline report and post-commissioning boundary measurement report to the National Environment Board notifications, with calibration certificates
- Generator test regime and the community notification template
- Source ranking and remediation options ordered by effect per baht
- Monthly continuous-monitoring reports, where monitoring is chosen
Standards applied
National Environment Board Notification No. 15 (B.E. 2540) — Leq 24 h 70 dBA, Lmax 115 dBA · Notification No. 29 (B.E. 2550) and the nuisance-noise notification (B.E. 2565) — 10 dBA criterion · ISO 9613-2 · ISO 1996-1/-2 · ISO 3747 · ISO 11820 · Ministerial Regulation on heat, light and noise B.E. 2559 (staff) · IEC 61672-1 Class 1
Ready to start?