Environmental Noise (EIA)

Large projects — roads, airports, power plants, industrial estates — must pass an Environmental Impact Assessment (EIA) covering noise and vibration. We produce the EIA noise chapter by combining field measurement, statistical analysis and acoustic modelling to internationally recognised standards, so the project both complies with the law and is accepted by the community.

Scope

  • Project characterisation and noise-assessment scoping
  • Baseline noise measurement across the study area
  • Build an acoustic propagation model to predict impact during both construction and operation
  • Compliance assessment against Thai noise law and standards
  • Design and evaluation of mitigation (barriers, layout, operating-time limits)
  • EIA noise chapter with noise maps and calculations
  • Continuous online environmental noise monitoring — IEC 61672-1 Class 1 instruments with cloud connectivity, real-time dashboards, and automatic email/SMS alerts on exceedance
  • Support for public hearings and community communication

Standards & method

We reference ISO 1996-1/-2 for environmental noise measurement and ISO 9613-2 for outdoor sound propagation, modelled in SoundPLAN, together with the WHO Guidelines for Community Noise and the requirements of the Office of Natural Resources and Environmental Policy and Planning (ONEP).

Deliverables

  • EIA noise chapter with baseline data, acoustic modelling results and mitigation measures
  • Day/Night and construction-phase noise maps
  • Compliance comparison tables against legal limits
  • Post-project noise monitoring plan
  • Online monitoring with downloadable daily/weekly/monthly summary reports plus scheduled maintenance and calibration

FAQ

What is an EIA noise study?

Part of the Environmental Impact Assessment that evaluates a project's noise and vibration impact on the community and proposes mitigation.

When is one required?

Large projects such as highways, power plants, airports and certain factories are typically required to prepare one by law.

How long does it take?

Typically 6–12 weeks depending on project size and complexity.